Telok Blangah (Block 91A)

Designed by Fifth Avenue Interior

Qanvast
Qanvast
Qanvast
Qanvast
Qanvast
Qanvast
Qanvast
View All12 Photos
Qanvast
Qanvast
Qanvast
Qanvast
Qanvast
Qanvast
Qanvast
Qanvast
Qanvast
Qanvast
Qanvast
View all 12 photos ›
Property Type
Apartment
Property Status
New
Area Size
98m²
Cost
S$40,000
Bedrooms
3
Style
Contemporary
Renovation Duration
8 weeks
Year of Completion
2018
View MoreHide

Works included

  • Carpentry
  • Flooring
  • Hacking
  • False Ceiling
  • Painting
  • Plumbing
  • Feature Wall
  • Electrical Rewiring
  • Aircon
  • Tiling
View MoreHide

About Fifth Avenue Interior

* Fifth Avenue Interior is currently facing an influx of projects so a longer response time is to be expected. New projects are still welcomed Fifth Avenue Interior is a local interior design firm specialising in custom residential, retail and office design. As a full service firm, all projects receive singular focus and attention to details, which carries a successful project from concept through to completion. Accreditations: HDB License - HB-09-5020C CaseTrust Accredited Bizsafe Level 3 Best Of Houzz Service 2018 2016 Top Business Achiever 2019 Business Trust 2019 Top 25 Singapore Excellence Blum Prefer Partner Excel Hardware Prefer Partner Nippon Paint Designer Of Choice
* Fifth Avenue Interior is currently facing an influx of projects so a longer response time is to be expected. New projects are still welcomed Fifth Avenue Interior is a local interior design firm specialising in custom residential, retail and office design. As a full service firm, all projects receive singular focus and attention to details, which carries a successful project from concept through to completion. Accreditations: HDB License - HB-09-5020C CaseTrust Accredited Bizsafe Level 3 Best Of Houzz Service 2018 2016 Top Business Achiever 2019 Business Trust 2019 Top 25 Singapore Excellence Blum Prefer Partner Excel Hardware Prefer Partner Nippon Paint Designer Of ChoiceRead MoreHide

Rating

4.5
Based on reviews left by homeowners
Professionalism4.6 / 5
Workmanship4.3 / 5
Project Management4.5 / 5
Design4.5 / 5
View Company ›
Reviews (141)
n
extravagant price with cluless result

Reviewed by ng・Submitted 18 Apr 2021・Project completed Mar 2021・Designer Kenny Ang

As seen on the review of a 6 year supertrust with a renovation of minimum 50k budget. A renovation for 4 room new bto with only 2 bedroom amounting to 50k turn out to be a clueless result at the point of handover. Due to the condition of handover, further rectification are best effort basis due to it being an aftermath rectification. Review is base on handover condition, prior to further rectification before a change of ID is demanded. REVIEW IS STRICTLY DONE ON HANDOVER condition as we are required to sign off the document on our acceptance to the project render. Summary - poor workmanship poor finishing poor project management more costly of similar item via direct supplier is a norm as its through id, but high cost does not equate to high workmanship and finishing by engaging professional quality of subpar acceptance qanvast rating is overrated for the whole house tiling, even hdb default contractor who does kitchen only does a better job than what is done in the project at handover condition, thus a full rectification is render across the whole flat ID proclaim professionalism during renovation and good contractor engage by fifth avenue thus the longer lead-time instead practically whole house required numerous rectification As explain to new homeowner through the assigned ID This is just a handover, rectification can be done accordingly when raised even after move in, but scroll up on the above observation Results due to initial poor workmanship, there are limitation to rectification can be perform due to fixture are done up as opposed if its done once and right as such home owner have to accept it even a small fix after move in, the result to the living condition to dust and dirt is extreme across the whole flat, imagine dust from door to flat and vice versa 20 times or more, ontop of internal works that be as dusty as tiling, whereas if a good job is done initially, none of this will surface note – a professional cleaning along with high cost multiply number of recurrences needed once owner have move in due to above handover, this sum will balloon to 4 digits of high value if necessary consider if tiling/painting/patching is involved, above will be valid personal advise please ensure new home owners source for multiple supplier on fixtures (unless you are willing to pay 30-50% above market price for oem while the price could be used for branded kits) please ensure you be diligent to check on the workmanship otherwise it will result in being your responsibility on the aftermath, it will be best to engage a 3rd party defect checks to validate quality issue (yes, this is engage through professional at homeowner expense, refer to attach report image) its better to be strict on yourself to ensure fix is done, unless you are willing to accept it for the long run do not expect qanvast to assist much, just treat it as a pure marketing/matchmaking service for ID listed

Read More
n
extravagant price with cluless result

Reviewed by ng・Submitted 18 Apr 2021・Project completed Mar 2021・Designer Kenny Ang

As seen on the review of a 6 year supertrust with a renovation of minimum 50k budget. A renovation for 4 room new bto with only 2 bedroom amounting to 50k turn out to be a clueless result at the point of handover. Due to the condition of handover, further rectification are best effort basis due to it being an aftermath rectification. Review is base on handover condition, prior to further rectification before a change of ID is demanded. REVIEW IS STRICTLY DONE ON HANDOVER condition as we are required to sign off the document on our acceptance to the project render. Summary - poor workmanship poor finishing poor project management more costly of similar item via direct supplier is a norm as its through id, but high cost does not equate to high workmanship and finishing by engaging professional quality of subpar acceptance qanvast rating is overrated for the whole house tiling, even hdb default contractor who does kitchen only does a better job than what is done in the project at handover condition, thus a full rectification is render across the whole flat ID proclaim professionalism during renovation and good contractor engage by fifth avenue thus the longer lead-time instead practically whole house required numerous rectification As explain to new homeowner through the assigned ID This is just a handover, rectification can be done accordingly when raised even after move in, but scroll up on the above observation Results due to initial poor workmanship, there are limitation to rectification can be perform due to fixture are done up as opposed if its done once and right as such home owner have to accept it even a small fix after move in, the result to the living condition to dust and dirt is extreme across the whole flat, imagine dust from door to flat and vice versa 20 times or more, ontop of internal works that be as dusty as tiling, whereas if a good job is done initially, none of this will surface note – a professional cleaning along with high cost multiply number of recurrences needed once owner have move in due to above handover, this sum will balloon to 4 digits of high value if necessary consider if tiling/painting/patching is involved, above will be valid personal advise please ensure new home owners source for multiple supplier on fixtures (unless you are willing to pay 30-50% above market price for oem while the price could be used for branded kits) please ensure you be diligent to check on the workmanship otherwise it will result in being your responsibility on the aftermath, it will be best to engage a 3rd party defect checks to validate quality issue (yes, this is engage through professional at homeowner expense, refer to attach report image) its better to be strict on yourself to ensure fix is done, unless you are willing to accept it for the long run do not expect qanvast to assist much, just treat it as a pure marketing/matchmaking service for ID listed

Read More
View All Reviews ›
Completed your renovation with this firm? Write a review
63 people enquired recently
Submit an enquiry
Property Type
HDB
 
Property Status
New
 
Area Size (m²)
Budget (S$)
Keys Collected
Yes
 
This firm has a minimum budget requirement of S$50,000.
Why Qanvast