Telok Blangah Heights (Block 70C)
Designed by M3 Studio
Works included
Carpentry
Painting
Hacking
Plumbing
Feature Wall
False Ceiling
Electrical Rewiring
Tiling
About M3 Studio
Rating
Reviewed by Eugene・Submitted 12 Apr 2021・Project completed Jan 2019・Designer Montie
We engaged M3 Studio to do up our reno for our old HDb flat and they provided many good solutions and were very patient with us on the time we took to make our choices. With good planning the renovation went on without much trouble and we achieved the feel and look that we desired. Overall a great job done. Thank you very much.
Reviewed by Eugene・Submitted 12 Apr 2021・Project completed Jan 2019・Designer Montie
We engaged M3 Studio to do up our reno for our old HDb flat and they provided many good solutions and were very patient with us on the time we took to make our choices. With good planning the renovation went on without much trouble and we achieved the feel and look that we desired. Overall a great job done. Thank you very much.