Marina Bay Residence

Designed by Space Concepts Design

View All6 Photos
View all 6 photos ›
Property Type
Condo
Property Status
New
Area Size
84m²
Cost
S$35,000
Bedrooms
3
Style
Contemporary
Renovation Duration
6 weeks
Year of Completion
2013
View MoreHide

Works included

  • Carpentry
  • False Ceiling
  • Painting
  • Electrical Rewiring
  • Feature Wall
  • Wallpaper
View MoreHide

About Space Concepts Design

At Space Concepts Design, our outstanding designers will capture the essence of your spirit, and coupled with a creative transformation of the space you have at home, transcend it into a living piece of art.
At Space Concepts Design, our outstanding designers will capture the essence of your spirit, and coupled with a creative transformation of the space you have at home, transcend it into a living piece of art.Read MoreHide

Rating

4.4
Based on reviews left by homeowners
Professionalism4.6 / 5
Workmanship4.3 / 5
Project Management4.5 / 5
Design4.4 / 5
View Company ›
Reviews (23)
SC
Unable to recommend

Reviewed by Seline Chiew・Submitted 12 Apr 2021・Project completed Dec 2020・Designer Joanne

There should be more professionalism and ethics. We hacked the whole flooring and some walls and rebuilt some. The finishing of the walls are uneven even thought they are newly built and the firm’s in-house tiler throw the cut tiles and cement into the toilet sewage pipe. Beforehand we had reminded them several times to ensure the pipes are cleared without debris, the ID also insisted they cleared it. We did the dirty job by digging into the pipes and found big size debris, enough to choke our sewage within months of living in. ID offer help to clear, we thought that should have been done before we discover it? We think the trust are compromise. ID quarrel and assume we don’t want to pay them the balance 5%, we just waited for the debris are cleared and we paid them the balance. The toilet tiling are also not balance, causing my basin and wall to have a slanting gap. ID told us to give and take. As home owners, we give and take too much and can just pray hard that there won’t be more problems in future.

Read More
SC
Unable to recommend

Reviewed by Seline Chiew・Submitted 12 Apr 2021・Project completed Dec 2020・Designer Joanne

There should be more professionalism and ethics. We hacked the whole flooring and some walls and rebuilt some. The finishing of the walls are uneven even thought they are newly built and the firm’s in-house tiler throw the cut tiles and cement into the toilet sewage pipe. Beforehand we had reminded them several times to ensure the pipes are cleared without debris, the ID also insisted they cleared it. We did the dirty job by digging into the pipes and found big size debris, enough to choke our sewage within months of living in. ID offer help to clear, we thought that should have been done before we discover it? We think the trust are compromise. ID quarrel and assume we don’t want to pay them the balance 5%, we just waited for the debris are cleared and we paid them the balance. The toilet tiling are also not balance, causing my basin and wall to have a slanting gap. ID told us to give and take. As home owners, we give and take too much and can just pray hard that there won’t be more problems in future.

Read More
View All Reviews ›
Completed your renovation with this firm? Write a review
2 people enquired recently
Submit an enquiry
Property Type
HDB
 
Property Status
New
 
Area Size (m²)
Budget (S$)
Keys Collected
Yes
 
This firm has a minimum budget requirement of S$20,000.
Why Qanvast